ACME Assists In Multi-Modal Transportation Project | ACME Environmental

ACME Products supplied and continues to maintain a silt curtain for construction of a bridge project at I-244 and the Arkansas River located in Tulsa, Oklahoma. The $70 million project replaced an aging, local landmark bridge in two phases. Phase one began in June of 2011 and phase two is expected to be completed by the end of 2014. ACME manufactured two sets of 1,100 feet of silt curtains used during each phase of the construction project. The Arkansas River flow rate is controlled upstream by a dam which discharges large amounts of water downstream in the event of a large rainfall. ACME installed the silt curtain using custom anchoring techniques due to the variable flow rates in the Arkansas River. The silt curtain was manufactured with a 6 inch float and a 5 foot skirt depth with 3/8” chain. The curtain was manufactured to meet all of the contractor and DOT specifications. ACME maintained the silt curtain throughout the entire length of the project. Maintenance included re-anchoring the silt curtain, debris removal and silt curtain fabric repair.

news boom 2

Want more information on silt curtains? Contact us today with your silt curtain question or request.

Read all about the bridge opening by clicking here.

Read more about the project here.

Related Case Studies

Thumbnail for ACME In Action article highlighting recent Oklahoma oil spill responses

ACME In Action: Recent Oklahoma Oil Spill Responses

Recent Emergency Responses Recently, ACME Environmental has proven its readiness and reliability with multiple emergency spill responses across Oklahoma, all...

Read More
ACME responding to an oil spill in Northern Oklahoma

ACME in Action: Northern Oklahoma Oil Spill

Background On June 2nd, 2023, ACME Environmental responded to an oil spill that had severely impacted a creek and several...

Read More

Swift Water Deployment Training with ACME | Winter 2020

On November 30 and December 1, 2020, ACME Environmental’s Emergency Response team took part in a two-day swift water containment...

Read More

Kenedy, Texas Remediation Response – August 2019

In August of 2019, ACME Environmental’s remediation team responded to an oil spill in Kenedy, Texas. ACME remediated and treated...

Read More